Right On North Idaho Wolfman, it is just above weld, cracked thu both sides. I’m thinking 7018 up hill, but have a welder coming that’s been around from underwater welding in navy to now pipeline welding.
Was having Steering Cylinder rebuilt, by Kubota shop Mechanic when he spotted break in frame. It took him 6 hours to remove, rebuild, reinstall and refill hydraulic oil and work air off system.
He furnished all tools except 3, I had aluminum 1” punch, 2 small steel punches.
All for $300 + 2 Dr. Peppers
I have him coming back to repair MF 135 hydraulics.