I have a few large oaks that need to come down. But almost done taking down the trees. Cleared area will get turned into lawn and fenced for the pooch. About 1 acre, probably a touch more.
Taking the trees back far enough from the build site so it won't be a danger from falling on the house, shop, or camper.
We were looking at double wides till the lenders started throwing in $10k to 17k in fees
I told them to pound sand. The company looking at $17k in fees wouldn't send me the info in writing. I was actually fixing to turn them over to the states attorneys office for price gouging.
I'm gonna have the septic installed once it dries out enough. Water meter can get installed at anytime. I'll have the septic permit today. Then we can start moving forward.
We're gonna have an 18x40 carport w/ slab installed for an RV. As well as a 30x40 shop installed for storage.
Later, we will have rough in done for plumbing and a 30x40 slab poured. Then get a steel building installed on that for a Barndominium. Then we will frame and install the interior as we see fit.