Mounted the boom to start working on the hydraulic hose routing. Pressurized the extend cylinder to check the operation and everything OK. Last picture I'm locating the manifold for the lock cylinders.
Attachments
-
92.7 KB Views: 572
-
83.9 KB Views: 427
-
88 KB Views: 365