Cleaned out the garage yesterday. Did a dump run this morning. Then rearranged some things so I could get the L1501 in the garage.
Serviced it to get it ready for winter. Fresh oil, filters, and treated the tank with power service for winter use.
Now to drain the gas tank on the generator. And to get that running
Generator got hit with ethanol
After the generator is running. My next task is to replace the wire, stinger and ground clamp on my old arc welder.
Picked up a new stinger, ground clamp, and 100ft of 1 gauge wire to replace the 40 year old leads on it.
Gives me 50 ft of reach for the leads so I can do some welding in the driveway on my trailer. Got stake pockets for extra tie downs, and a chain box to install on the tongue.
Also have a 2 ton crank winch to install on the front of the trailer for the occasional recovery project.
Sent from my iPhone using Tapatalk