I thought I'd pick a few brains tonight. I need to lay in a new well supply line and wire. I have been doing some grading which lowered the ground level, even to exposing my old line. So, it needs to go down before freezing weather hits, and it's got at least one splice in it anyway, and the wire is only 14 gauge. I plan to upgrade the pump so I need something bigger.
What do you think of laying in 4" conduit and pulling the new line & wire through it? This would make it possible to replace it in the future if it ever needed it, without having to dig again.
The big question is, would 1 or 1 1/4" poly pull through a 4" sweep or two. Or 4.
Thoughts?
What do you think of laying in 4" conduit and pulling the new line & wire through it? This would make it possible to replace it in the future if it ever needed it, without having to dig again.
The big question is, would 1 or 1 1/4" poly pull through a 4" sweep or two. Or 4.