So now that I replaced my lower lift pins I have to get the box heavy enough
Again, my goal is to have a lifting eye and a couple of threaded rod connections sticking out the top. The rods are for some future something that I'll think of someday
So I acquired a 3/4"X10 forged eye bolt from a friend and gathered up a 10' length of shallow strut, 6' ea of 1/2 and 3/4 threaded rod, and assorted hardware.
This is what it looks like now:
The top piece of strut will be bolted down to the top lip of the box. That should keep everything square while I shovel in 720lbs of concrete. The lifting eye should end up right in the center.
I'm not sure whether or not I am going to remove the top piece of strut when done. Right now I'm leaning to keeping it on.
Again, my goal is to have a lifting eye and a couple of threaded rod connections sticking out the top. The rods are for some future something that I'll think of someday
So I acquired a 3/4"X10 forged eye bolt from a friend and gathered up a 10' length of shallow strut, 6' ea of 1/2 and 3/4 threaded rod, and assorted hardware.
This is what it looks like now:
The top piece of strut will be bolted down to the top lip of the box. That should keep everything square while I shovel in 720lbs of concrete. The lifting eye should end up right in the center.
I'm not sure whether or not I am going to remove the top piece of strut when done. Right now I'm leaning to keeping it on.