More progress today on the tower project. Didn't want to drill the hole for the third and last I beam as the lawn isn't completely dried out yet and I would really destroy it working on it now. As it is, I'll probably do some serious damage tomorrow if it doesn't rain.
As other posters have mentioned, the weather really sucks for this type of work. Today was in the 90's again and way too humid.
I used a manual post hole digger to clean out the hole I drilled yesterday with the auger. Then used the tractor to carefully lower the 1st tower section into it. The sections are 10' long and weigh ~100lbs. A piece of cake compared to the I beams.
The forks make life easier with handling the 60lb bags of quick mix. I positioned the pallet waist high next to the hole so I wouldn't have to lift, only set them down next to the hole. Cut open with a knife and dump them in a hole. I soaked them down after each bag was dumped in. Beats actually mixing and its worked for me before.
Put in 33 bags into that hole!
View attachment 132772
and what it looked like:
View attachment 132774
Perfectly
square plumb!