Got another leak. 80 year old black iron pipe crosses under the driveway in a half mile line. Of course happens in the worst time.
Studying bucket designs especially for working around utilities. Unbolted the teeth from the 12” B26 bucket. Has a flat cutting bar. Hope less chance of hooking the line when uncovering and causing collateral damage. Their are some specialty buckets made just for this type work. This part of driveway is part of the 300 year old wagon road that used rocks and clay to fill ruts. Tree lined in the woods so there is going to be roots.
Plan is to uncover both the line on sides. Cut. Ditch and remove the old line. Thread the two ends. SS couplings. PVC pipe inside 4” corrugated plastic drain pipe. Couple of bags of sackcrete, left in the bag, on the pipe on the ditch side.
Several repairs over decades on this line. Some point will need to replace.
Studying bucket designs especially for working around utilities. Unbolted the teeth from the 12” B26 bucket. Has a flat cutting bar. Hope less chance of hooking the line when uncovering and causing collateral damage. Their are some specialty buckets made just for this type work. This part of driveway is part of the 300 year old wagon road that used rocks and clay to fill ruts. Tree lined in the woods so there is going to be roots.
Plan is to uncover both the line on sides. Cut. Ditch and remove the old line. Thread the two ends. SS couplings. PVC pipe inside 4” corrugated plastic drain pipe. Couple of bags of sackcrete, left in the bag, on the pipe on the ditch side.
Several repairs over decades on this line. Some point will need to replace.