Well.......we finally got here.
Cement floor was poured today......it had some wild moments but overall it came out well. The second truck evidently mixed in more calcium carbonate than they should have so there was a little "urgency" to some of the work. There was also about 2 yds of cement "leftover" that was piled up wet outside the door that the contractor and I teamed up with the B2601 to take about 6 buckets of wet cement out back and dump.......I didn't have a great plan for extra cement. I ended up making a small pad off to the side of the yard that I can drop the pallet forks, box blade etc. on for storage......I flattened it out with the tractor bucket then tamped it down with my hand steel tamper......glad I had one.
Came out well overall. Gotta let it sit for a couple days and dry before putting some "stuff" in there.
I also need to think about what I want to spread around outside the building to raise the grade a touch......gravel, stay-mat etc
EDIT: Just looked back at my original post.....May 25th.....so roughly 6 months to the day from start to finish when I gave my deposit and then through the site work, inspections etc. Targeted a budget of $50K and came in at about $57-58K for those who are interested.
View attachment 90778
View attachment 90779
View attachment 90780
View attachment 90781
View attachment 90782