Just had a house built in an area with very rocky soil. There are thousands of rocks in the soil and I’d like to remove most of them before I have some topsoil brought in. 90% of them are baseball size and smaller. There are a few big ones that I can just use my hands to move. I’m pretty close to final grade so I want to avoid cutting/filling. Once the topsoil is brought in I will be at final grade. I have an L2501