So yesterday I took the leap and signed papers for a basic Morton Standard building of 24' x 32' with 14' walls and a 12x12 door (and a 'people door').
With the prices of darn near everything being insane these days I elected to go with a "pole barn" build with columns in the ground and a gravel floor. A cement slab can be poured at a later date if I desire.
The "fun" part of this build is going to be the site prep where we need to basically turn virgin forest into a level "diggable" 45' x 45' pad. The site has a sloped drop off front to back of about 5' that will need fill and a number of trees need to come down including one pine that is about 100' tall and an Ash that is also about the same. The good news is I have an amazing "tree guy".
I'm working on lining up a "site guy" as I am under no illusions that I can handle the stumps, rocks and compaction needed with my B series. BUT, the B-Series will get a workout with all the periphery stuff as well as be part of the "logging operation". I also have a drainage area that flows by the site, the current culvert basically just spills out in the "flat" and runs a hundred yards down to a small creek. As part of the project I am going to dig a more "formal" drainage flow and line it with rock to ensure the flow goes where we want and does not impact the new pad.
Concurrently 50yds away we will have a 16kWh solar array going in as well.......lots of work going on this year.......exciting and scary all at the same time.
I will try and post some progress pics as we go........
With the prices of darn near everything being insane these days I elected to go with a "pole barn" build with columns in the ground and a gravel floor. A cement slab can be poured at a later date if I desire.
The "fun" part of this build is going to be the site prep where we need to basically turn virgin forest into a level "diggable" 45' x 45' pad. The site has a sloped drop off front to back of about 5' that will need fill and a number of trees need to come down including one pine that is about 100' tall and an Ash that is also about the same. The good news is I have an amazing "tree guy".
I'm working on lining up a "site guy" as I am under no illusions that I can handle the stumps, rocks and compaction needed with my B series. BUT, the B-Series will get a workout with all the periphery stuff as well as be part of the "logging operation". I also have a drainage area that flows by the site, the current culvert basically just spills out in the "flat" and runs a hundred yards down to a small creek. As part of the project I am going to dig a more "formal" drainage flow and line it with rock to ensure the flow goes where we want and does not impact the new pad.
Concurrently 50yds away we will have a 16kWh solar array going in as well.......lots of work going on this year.......exciting and scary all at the same time.
I will try and post some progress pics as we go........