I went to Northeastern University, at that time almost 100% coop school. You did a 13 week semester then a 13 week curriculum related job for the last 4 years of schooll (5 yr program). My coop job was at MIT's Instrumentation Lab in Cambridge. I worked with the engineers and techs. They gave me a tech bench setup to do my work. It was complete with test gear, soldering station etc.
My 1st day I was greeted by the other techs and shown to my bench. They told me the switch for the 115volt outlets was under the bench and just flip it on when I was ready to start work each day.
What they kind of forgot to tell me was they had taken a regular graphite pencil, stripped off both ends, attached a 115 zip cord to it and taped it to the underside of the bench and of course plugged it in.
They walked away, I sat down, flipped the switch . . . scared the living everything out of me. The sound, the flash and the damn smoke!