Hello. I have a few posts on here recently about mounting a Boss 7' 6" V plow to my L4630. I am at the final stage of the install and need to somehow get switched power inside the cab at the circuit breaker. 6 or 7 years ago I installed a 3rd function valve from W.R. Lang. For that install I needed to do the same same thing. I remember taking the circuit breaker box out and connecting to a wire in behind. I checked my install instructions from Lang and there is nothing there to explain how I did that part of the project. I even called Lang to see if maybe I had misplaced a page of the instructions or something but that answer was no. When I was putting in the 3rd function kit on, I remember following some instructions with pictures, etc.... Can you help? I am thinking maybe someone here guided me to a website or sent me something that I followed. I did check history of my posts here and found nothing there either. Feels like an episode of the Twilight Zone. : )