I need to pull my well pump this summer, its on 1 1/4" galvanized pipe - 300' to 500' deep. What I'm looking for are ideas on how to do this myself pulling
21' lengths of pipe at a time. I have done it pulling 10' to 11' at a time, cutting the pipe and repeat. That process is slow and messy ( but its as high as my loader will go).
I am considering building a SSQA boom poll but am a little concerned about stability.
I pulled / set pumps for years as a younger man with a crane, but those days have passed. Now i just want to do my own and possible 3 or 4 others a year in my area.
Any input would be greatly appreciated.
E/S
21' lengths of pipe at a time. I have done it pulling 10' to 11' at a time, cutting the pipe and repeat. That process is slow and messy ( but its as high as my loader will go).
I am considering building a SSQA boom poll but am a little concerned about stability.
I pulled / set pumps for years as a younger man with a crane, but those days have passed. Now i just want to do my own and possible 3 or 4 others a year in my area.
Any input would be greatly appreciated.
E/S