My Woodland Mills WC68 chipper arrived. With the temps today between 10-15 F there was no way I was going to attempt assembly outside. Fortunately they pack this like they love it. There is metal channel running underneath it like a metal pallet (since I haven't stated unpacking it yet I'm not sure what is there). Since I don't have forks it was on to plan B.
I snaked 2 chains through the channels and then used a lifting strap to connect the two chains and give me pretty much a center lifting point. The strap was then wrapped around my fel bucket.
Then is was a challenge just lifting everything. I'm guessing I am at the fel's limit with the load and the bucket weight.
All went smooth, slow but smooth and got it into the garage without incident
Video of moving into garage
Next steps, unpack it and assemble it - I have 5 gallons of hydraulic fluid ready to go in it!
ahh couldn't wait for tomorrow. Started uncrating tonight. It's a hell of a crating job!
I snaked 2 chains through the channels and then used a lifting strap to connect the two chains and give me pretty much a center lifting point. The strap was then wrapped around my fel bucket.
Then is was a challenge just lifting everything. I'm guessing I am at the fel's limit with the load and the bucket weight.
All went smooth, slow but smooth and got it into the garage without incident
Video of moving into garage
Next steps, unpack it and assemble it - I have 5 gallons of hydraulic fluid ready to go in it!
ahh couldn't wait for tomorrow. Started uncrating tonight. It's a hell of a crating job!
Last edited: