I'm in the process of putting a second entrance on my property and decided a toothbar would make this task easier. I made this out of scrape metal I had laying around for my B8200 bent cutting edge. It works great.
And here are some pics of the construction of the new driveway. Finished
removing the top soil and then had 45 metric tons of gravel delivered. Waiting a few weeks before ordering the rest of the gravel.
Thanks for the kind replys. This is a large project but I once dug a pond that was 40 by 20 and about 4 feet deep with a fel on a B6200. Lots of seat time on that project.