Thought I would share pictures of my latest project. We are building an 8100 sqft pre-engineered steel building and I am my own general contractor and chief laborer. The county required (and I agree with) a 20 foot driveway with 35 foot radius's on both sides and a 12" culvert pipe underneath. You can see the progress in the pictures but I am thoroughly pleased with how smooth I was able to finish the dirt prior to gravel and then the gravel using the grading scraper behind the L4701. Enjoy the project porn!
Attachments
-
96 KB Views: 247
-
97.1 KB Views: 235
-
95.2 KB Views: 232
-
96 KB Views: 228
-
96.8 KB Views: 208