Hey all
I’m planning on digging up the our driveway, laying down some 4” minus. Covering that with geotechnical, and top coat of 1 1/2” crush + run 6” deep. Driveway is 250’ long with one 25’ x 25’ parking area, and the space in front of a two bay garage.
The spoils I will put in a low spot on the front lawn. Take the curse out of the steep angles and cover with compost/topsoil. I need to make it safer for mowing! Just need to wait on spring.
Big plans for my B 2601. Can’t wait to get started!