I have 100 feet to go to finish a road for water well driling access. I've already built a proper 170 foot compacted crushed stone driveway to the future house site which will be permanent. Expensive and time consuming. The driller wants the last 100 feet, which is currently dirt, leveled and compacted to be "stoned" as well. It consists of some clay and muddy soils which don't compact well with a plate compactor. This last 100 feet will be the actual house site which will be dug up and excavated for a foundation so any work /stone done will be removed/wasted. The well will be positioned at the end of this run with the house between the well and permanent driveway.
I really don't want to spend time and funds on a project that that will be dug up. Stone runs $1000-1500 for a 4 inch layer of the required area, and that may not be enough for the 80,000 lb load of the rig. Anyone else have any experience with "jumping jack" compactors or using quicklime or hydrated lime to harden the soil for rig access? Would dry sand or cement dust harden the soil sufficiently? Any other ideas? Please help me save my back and bucks.... thank you.....
I really don't want to spend time and funds on a project that that will be dug up. Stone runs $1000-1500 for a 4 inch layer of the required area, and that may not be enough for the 80,000 lb load of the rig. Anyone else have any experience with "jumping jack" compactors or using quicklime or hydrated lime to harden the soil for rig access? Would dry sand or cement dust harden the soil sufficiently? Any other ideas? Please help me save my back and bucks.... thank you.....

Attachments
-
1.2 MB Views: 5



