The floor of my new barn is 8 days old.
It's 4" with fiber and rebar. We back the base with AB3 gravel. The concrete guys came and left without me ever seeing them ( they did a great job from what I can tell ). Anyway, I hear 7, 14 or 28 days before bringing in a truck / tractor.
Can anyone set me straight?