What I ended up doing…. I dug new trenches parallel to old plugged lines about a foot or so away from them… disconnected completely from the old system. The new drain lines are laid on top of 6” of 3” round river-rock…then covered with another 6” of rock…then geo-cloth…then the topsoil is pushed back over it all.
Works great. Last time in my lifetime I’ll have to deal with this.
Works great. Last time in my lifetime I’ll have to deal with this.
Last edited: