Runs With Scissors
Well-known member
Equipment
L2501 TLB , Grappel, Brush Hog, Box Blade, Ballast box, Forks, Tiller, PH digger
I am going to try and get some Federal help through the ADA for my incurable "buy-a-tool-osis".
Well a few weeks ago those bastards at Langmuir Systems decided to pull a dirty trick and had a "4 of July sale" and offered $700 bucks off their "Crossfire Pro CNC plasma system."
I am only human and my disability, simply would not allow me to pass that deal up,
So, off we go.
"Shop Space" is getting limited, so I had to make a "command decision" and using using something similar to the "Eminent Domain" doctrine, I requisitioned about 400 more square feet from the "Finished Basement" project.
That project was DOA a long time ago, so no biggie. (hahahah except for the toilet....I did put a sh!tter down there, and it stays...hahah)
The machine came rather well packed, but it does come in "multiple shipments", so you kind of have to "wait for it"
It took about 2 weeks for it all to arrive.
That gave me time to "prep" a "new section" of shop space.
Now I am a yuge fan of painting "shop areas" white to reflect as much light as possible, so after moving all the "crap" from the new shop area, it took 2 coats of "epoxy" to get the floor covered properly.
Here it is "pre epoxy"
And here it is after 1 epoxy coat and some HD lighting......Those 46 inch lights do a fantastic job.
I decide to use a "set up" table to try and keep everything as "organized" as possible (at least for me)
It's almost "go time"....
Well a few weeks ago those bastards at Langmuir Systems decided to pull a dirty trick and had a "4 of July sale" and offered $700 bucks off their "Crossfire Pro CNC plasma system."
I am only human and my disability, simply would not allow me to pass that deal up,
So, off we go.
"Shop Space" is getting limited, so I had to make a "command decision" and using using something similar to the "Eminent Domain" doctrine, I requisitioned about 400 more square feet from the "Finished Basement" project.
That project was DOA a long time ago, so no biggie. (hahahah except for the toilet....I did put a sh!tter down there, and it stays...hahah)
The machine came rather well packed, but it does come in "multiple shipments", so you kind of have to "wait for it"
It took about 2 weeks for it all to arrive.
That gave me time to "prep" a "new section" of shop space.
Now I am a yuge fan of painting "shop areas" white to reflect as much light as possible, so after moving all the "crap" from the new shop area, it took 2 coats of "epoxy" to get the floor covered properly.
Here it is "pre epoxy"
And here it is after 1 epoxy coat and some HD lighting......Those 46 inch lights do a fantastic job.
I decide to use a "set up" table to try and keep everything as "organized" as possible (at least for me)
It's almost "go time"....
Last edited: