I had 12 yards of gravel delivered for my road. I asked the driver to lay it down at a 2 inch depth. I guess he decided that an 8 plus inch depth would be better. After using my box blade to cut it down and spread it out I ended up with a lot of woopedos.
Not having a land plane I came up with this from my scrap pile. It actually worked much better than I had anticipated, with the only draw back being that its only 4 foot wide so it took several passes.
Not having a land plane I came up with this from my scrap pile. It actually worked much better than I had anticipated, with the only draw back being that its only 4 foot wide so it took several passes.