Virtual Guy
Member
Equipment
Kubota L2501, loader, Land Pride box blade and grapple, John Deere MX5 cutter
I've put my links and such together and added the concrete. I'm just not sure how long to wait before I lift it. I've read everything from 2 days to a month. So how long did you wait and did you have any issues?
Thanks.
Thanks.