I have a large area of meadow that I want to put a path thru. The meadow was dry when we put the original trail in but quickly deteriorated when the farmall left ruts last year. Now it is virtually impassable. The funny thing it is on a slope.
I would like to use the backhoe and put a shallow ditch in using the spoil pile to raise the trail then adding rock and gravel to finish the trail. My question is do I start at the bottom of the slope or top of the slope? Do I keep the backhoe in line straddling the ditch or perpendicular to it. It is probably going to be several hundred feet long. It seems to make sense to start at the bottom and back up the hill keeping the ditch in front of me in line but I am a little worried I will be in really wet zones that may stick the tractor.
I would like to use the backhoe and put a shallow ditch in using the spoil pile to raise the trail then adding rock and gravel to finish the trail. My question is do I start at the bottom of the slope or top of the slope? Do I keep the backhoe in line straddling the ditch or perpendicular to it. It is probably going to be several hundred feet long. It seems to make sense to start at the bottom and back up the hill keeping the ditch in front of me in line but I am a little worried I will be in really wet zones that may stick the tractor.