Just curious what to expect moving rock and gravel down a 15 deg. grade.
Will be doing some woods road work, placing a culvert in a drainage ravine
and back filling with rock and gravel.
Seems like the front end would be even heavier on a down slope than level ground
but not sure and new to FEL work so just asking.
Will be doing some woods road work, placing a culvert in a drainage ravine
and back filling with rock and gravel.
Seems like the front end would be even heavier on a down slope than level ground
but not sure and new to FEL work so just asking.