Didn't think ahead far enough to take before pics, but here are the after pics.
A neighbor wanted me to move (4) granite rocks, (4) concrete planters, and then level a mounded section of her backyard, and dispose of the excess fill.
The fill consisted of a mix of dirt, decomposed granite, 1" minus gravel, and assorted other crap, compacted to roughly the hardness of concrete. My B7100 FEL bucket would not touch it, even with the front wheels lifted.
I used the backhoe to break it up/loosen it, the used the FEL to remove it.
Tight quarters, especially with the forks mounted.
Pic #1 Two of the concrete planters, with a granite rock in the background.
Pic #2 Another planter.
Pic #3 The formerly mounded area, note witness marks on fence paint.
Pic #4 & 5 More views showing mound contours.