lling my entire front lawn for a renovation and smoothing it out. How would you guys go about smoothing this out? Unfortunately, it measures out at 22-24* and due to moles is a little iffy on the BX. All the work I would be doing is up and down the face of it.
My thought process was to use the FEL to cut the high spots out. In particular, there is one spot that juts out towards the road at the halfway point. From there, I was going to add organic material (compost) to the entire lawn and just a bit of top soil to the low spot in the middle and then till the entire lawn.
Do you think this would work? Am I going about this the wrong way? Any other implements (besides a Harley Rake-the wife would have my dig my own grave) that would be a better fit for this task?
My thought process was to use the FEL to cut the high spots out. In particular, there is one spot that juts out towards the road at the halfway point. From there, I was going to add organic material (compost) to the entire lawn and just a bit of top soil to the low spot in the middle and then till the entire lawn.
Do you think this would work? Am I going about this the wrong way? Any other implements (besides a Harley Rake-the wife would have my dig my own grave) that would be a better fit for this task?
Attachments
-
391.7 KB Views: 382
-
1 MB Views: 385