I had 8 loads of gravel drop spread on my 2400' driveway to my future homesite. Some areas are thicker than others and are "soft" when driving on. We have been driving on it and even taking the D6 dozer up and down the road to help pack it down. Do I need to be patient and wait for it to pack down or is there something I can do to pack it down faster. The road was graded and then drop gate spread 2 weeks ago.
Sent from my iPhone using Tapatalk
Sent from my iPhone using Tapatalk