I have a RC60-82H deck that shredded a belt due to seized tensioner pulley.
What's involved with running the belt around the drive pulley under the gear box. How is that assembly connected? The gear box mounts on top of the pulley.
If I take the box brackets off how does the box connect to the pulley drive shaft?
Thanks
What's involved with running the belt around the drive pulley under the gear box. How is that assembly connected? The gear box mounts on top of the pulley.
If I take the box brackets off how does the box connect to the pulley drive shaft?
Thanks
Last edited: