Basement work finished now, at least for 2 months

ctfjr

Well-known member
Lifetime Member

Equipment
L3800HST
Dec 7, 2009
1,876
2,286
113
central ct
I added 6' of wall on one side of the workshop. I wanted to separate the metal grinding/cutting/drilling from the rest of the shop as I do a lot of electronics work there. While I was at it I added a 3 way switch for the lights. I never thought I'd be coming in from that side but I do almost every day. A couple of 20A outlets were added, just because you can never have enough of them.

The room on the other side is where I will end up storing some tractor implements. The previous owner had 1 pull string light in the ceiling that just wasn't adequate. I installed 3 duplex outlets in the ceiling wired to a new switch on that wall extension. Only had 2 4' led fixtures so up they went and are fine for now. There were no outlets in that area so I put 3 20A duplex boxes in on the common wall to the workshop.

1000006562.jpg



20231225_135241.jpg
 
  • Like
Reactions: 1 user

fried1765

Well-known member

Equipment
Kubota L48 TLB, Ford 1920 FEL, Ford 8N, SCAG Liberty Z, Gravely Pro.
Nov 14, 2019
7,843
5,066
113
Eastham, Ma
Looks good... I finally retired and hope to get my basements in better working order... and put the bathroom in finally 8 years later... :(
It took me 9 years to complete a 3rd bathroom in a previous house.
Not proud of that!
 
  • Like
Reactions: 1 user