I have (well had) a big dirt pile from when my shop was built. Told the missus "Ill use it...' She of course doubted me. Always does.
I have (had now) an area that had been 'reclaimed' 15 years ago and has settled, stumps rotted, leaving depressions (awwwww) you know the drill. So my little BX has been filling (six a day) garden carts of fairly clean fill that I drive through the woods and spread. Done about 30 days so far and have about ten to go.
So as to not destroy the lawn, I drive around the dirt pile. Well, it dips about a foot down at the back and then about 10' feet later, rises back up, this dip was/is for runoff. So today I... Laid down two rows (10 blocks per row) of concrete blocks. Ground was nice and flat and pitched fine. Blocks all lined up with no prep to the soil under. So four 4" square holes for the runoff. More than enough (one probably would of been adequate, but I had the blocks....) Then I moved fill over the blocks (about a 4" depth) and filled in the rest of the 'path' (16" deep and 7 feet wide)) for 8 feet. Probably 50 little loads from the FEL of the BX. Four+ hours of work. Done! Though I missed breakfast and lunch.....
Dirt pile is 60% gone.....