Runs With Scissors
Well-known member
Equipment
L2501 TLB , Grappel, Brush Hog, Box Blade, Ballast box, Forks, Tiller, PH digger
So one of the 287,976 projects I have going on right now is making “air drops” for each machine I have in the “main shop"
Amazingly, I decided to not buy a threading tool for the black pipe…..I instead have made a series of “quick trips” to the Depot, and that is getting annoying FAST…..
I have never done this much piping before and WOW, has it turned into “quite the project”.
Since I really don’t have a good handle on exactly what I want done, nor how to fit and measure properly, I decided that putting it together “dry” at first, then taking it all apart and re-building it again using pipe dope was the best way to go.
I’m not sure my thinking was “sound”, but I digress…….
One of the big dilemmas I have/had was the whole “which pipe dope is best"
It was weighing on me heavily….too heavily actaully….I just could not get past it.
The last time I used this “Blue Rectum Sealer"
Now although I did get a 100% leak free joints, I did not get them that way on the first shot.
I had to take a few of them apart once (or twice)….I was dreading having to do that again considering all the joints this project is going to have.
I have spent entirely too much time on the inter-web trying to figure out the “perfect sealer”, it was/is MIND BOGGLING how many opinions/options there are AGGGGGGGHHHHHH!!!
I finally decided to “pull the trigger” and go with my “gut” (kinda)
I decided on Loctite 577…….I have no affiliation with the Loctite company, but I do like their products in general, and this “anaerobic sealer” idea holds a special place in my heart for some strange/odd/curious reason(s).
I normally just “swing for the fences” and do an entire job and hope for the best, but I have decided to “lay up” this time.
I fear that if I completed the entire job and ended up with many leaks, I would be so demoralized that drastic actions may occur…..
SO, I decide to divide the job into a 3 part series, and do about 1/3 each day, and “pressure test” as I go.
Here are the first couple of joints
Oh yea, I also decided to put in a few random “unions” in case I ever need to repair/modify something, I will/can take out only that section…(at least thats the theory
)
Here is the “main connection” that will go to the compressor.
I have been taking my time and prepping each thread by cleaning with a wire wheel, then degreasing very well, using rags and “brake clean”.
Then I “schmutz” on the sealer and tighten……I am trying not to “over-tighten”, but who knows?
But now the waiting 24 hours part is killing me …..Damn IT!!!!!!

Amazingly, I decided to not buy a threading tool for the black pipe…..I instead have made a series of “quick trips” to the Depot, and that is getting annoying FAST…..
I have never done this much piping before and WOW, has it turned into “quite the project”.
Since I really don’t have a good handle on exactly what I want done, nor how to fit and measure properly, I decided that putting it together “dry” at first, then taking it all apart and re-building it again using pipe dope was the best way to go.
I’m not sure my thinking was “sound”, but I digress…….
One of the big dilemmas I have/had was the whole “which pipe dope is best"
It was weighing on me heavily….too heavily actaully….I just could not get past it.
The last time I used this “Blue Rectum Sealer"
Now although I did get a 100% leak free joints, I did not get them that way on the first shot.
I had to take a few of them apart once (or twice)….I was dreading having to do that again considering all the joints this project is going to have.
I have spent entirely too much time on the inter-web trying to figure out the “perfect sealer”, it was/is MIND BOGGLING how many opinions/options there are AGGGGGGGHHHHHH!!!
I finally decided to “pull the trigger” and go with my “gut” (kinda)
I decided on Loctite 577…….I have no affiliation with the Loctite company, but I do like their products in general, and this “anaerobic sealer” idea holds a special place in my heart for some strange/odd/curious reason(s).
I normally just “swing for the fences” and do an entire job and hope for the best, but I have decided to “lay up” this time.
I fear that if I completed the entire job and ended up with many leaks, I would be so demoralized that drastic actions may occur…..
SO, I decide to divide the job into a 3 part series, and do about 1/3 each day, and “pressure test” as I go.
Here are the first couple of joints
Oh yea, I also decided to put in a few random “unions” in case I ever need to repair/modify something, I will/can take out only that section…(at least thats the theory
Here is the “main connection” that will go to the compressor.
I have been taking my time and prepping each thread by cleaning with a wire wheel, then degreasing very well, using rags and “brake clean”.
Then I “schmutz” on the sealer and tighten……I am trying not to “over-tighten”, but who knows?
But now the waiting 24 hours part is killing me …..Damn IT!!!!!!