Runs With Scissors
Well-known member
Equipment
L2501 TLB , Grappel, Brush Hog, Box Blade, Ballast box, Forks, Tiller, PH digger
Elon Musk said something to the effect, "It's difficult being me, because I can't stop the ideas from flowing in my head".......
Well Elon......from one "Thousandaire" to another,
.......I can relate. 
They (my ideas) just flow non stop and they propagate new project "must haves"....it is a little crazy.....
Now if I could only make money like he does......
Ahh well, here we go.
So this CNC plasma cutter has spawned a whole new world of "project ideas" and sign making seems to be blossoming. Here is one for my granddaughter that is in the works.
One problem is that painting them has a few "glitchs" in its process.
I have some safety wire strung from the ceiling, but then I have to walk around them, constantly bumping into them, and the "paint smell" is getting annoying, to say the least.
So it's time to convert the "Bio-Dome" to a "spray booth".
( the "Bio-Dome" is a small room that I sectioned off and sealed so that I/we could drink, smoke cigars, and play video games until the wee hours, .........many moons ago)
So I decide that I need a "spray rack" and with my newly developed, beginner CAD skillset, I draw one up.
Man its very cool to be able to draw this stuff and have the computer calculate everything, then print it out, all nice and neat.
Much better than my "bar napkin" sketchs.
My SIL just gave me a lead on some 1x1 cold rolled steel, so I decide to use that.
This also reminds me that I still need to make some "roller guides" for when I cut long pieces.....but for now (and the past 30 years) a "makeshift stand" like this Gorilla step ladder with a shim, will have to suffice.
BTW I love that little horizontal Bandsaw.....It is one of my oldest tools and man I get a ton of use out of it.
I'll bet that I paid about $149 for it, 25'ish years ago. Money well spent.
It is especially nice for those "angled cuts".
Time to lay it out, and tack it together. Sometimes I wish I would get a small El'Cheapo MIG gun for downstairs tacking.....Maybe one day......but for now, its all done with the TIG machine.
As I go to do the second one......DAMN IT ALL TO HELL!!!!!!
There is my first F-up. I must have checked that thing 20 times before I cut it, and I'll be damned if I didn't cut one an inch short.
Good thing I have about 400 more feet....hahahahh
Well Elon......from one "Thousandaire" to another,

They (my ideas) just flow non stop and they propagate new project "must haves"....it is a little crazy.....
Now if I could only make money like he does......
Ahh well, here we go.
So this CNC plasma cutter has spawned a whole new world of "project ideas" and sign making seems to be blossoming. Here is one for my granddaughter that is in the works.
One problem is that painting them has a few "glitchs" in its process.
I have some safety wire strung from the ceiling, but then I have to walk around them, constantly bumping into them, and the "paint smell" is getting annoying, to say the least.
So it's time to convert the "Bio-Dome" to a "spray booth".
( the "Bio-Dome" is a small room that I sectioned off and sealed so that I/we could drink, smoke cigars, and play video games until the wee hours, .........many moons ago)
So I decide that I need a "spray rack" and with my newly developed, beginner CAD skillset, I draw one up.
Man its very cool to be able to draw this stuff and have the computer calculate everything, then print it out, all nice and neat.
Much better than my "bar napkin" sketchs.
My SIL just gave me a lead on some 1x1 cold rolled steel, so I decide to use that.
This also reminds me that I still need to make some "roller guides" for when I cut long pieces.....but for now (and the past 30 years) a "makeshift stand" like this Gorilla step ladder with a shim, will have to suffice.
BTW I love that little horizontal Bandsaw.....It is one of my oldest tools and man I get a ton of use out of it.
I'll bet that I paid about $149 for it, 25'ish years ago. Money well spent.
It is especially nice for those "angled cuts".
Time to lay it out, and tack it together. Sometimes I wish I would get a small El'Cheapo MIG gun for downstairs tacking.....Maybe one day......but for now, its all done with the TIG machine.
As I go to do the second one......DAMN IT ALL TO HELL!!!!!!
There is my first F-up. I must have checked that thing 20 times before I cut it, and I'll be damned if I didn't cut one an inch short.
Good thing I have about 400 more feet....hahahahh
Last edited: