Probably could have bought brackets. But lights were free and have lots of steel hanging around. So just time. Cut 4 pieces 2.5 inches long. Drilled 9/16 hole in 2 of them. 4 roll cage gussets that i have boxes full. Was going to tig them but got lazy. Round off the edges and into blast cabinet. I’ll powder coat tomorrow . Than I’ll do the unthinkable…. Drill holes in ROP to hide wires. No OSHA around here 1 hour of time for 2 brackets… i did correct angle that ROP is on to keep lights square. I could make guards but no real trees were ill be running this garage queen. Needed lights for snow removal .