While I'm still a long way off from receiving my grapple I thought I'd run the hydraulics to it while I wait.
Here is my goal. The grapple will connect with breakaway couplers mounted on the round tube that goes between the loader arms. From there I would go back on the right side to the area of the fel control valve. There I can take advantage of the existing hose loop that allows for the rotational movement of the arms. At that area I will have another set of couplers jic I ever want to remove the loader.
From those couplers it goes to the back going under the right side foot well, over the hydraulic filter, over the rear axle and up to the remote connections.
Below is the path I'm proposing. I would appreciate any comments on anything I missed or a better way.
Oh, and I marked my arrows backwards I was thinking about it from back to front
Then from under footwell follow hoses to loader valve
then follow the bundled hose loop to get under the fel arm - its somewhere around here I need the coupler set, perhaps a bracket mounted to the 5" loader support tube?
Pop out from under the arm and go to breakaway couplers
Plate with breakaway couplers here for the grapple connection
Well that's the plan, any suggestions?
Here is my goal. The grapple will connect with breakaway couplers mounted on the round tube that goes between the loader arms. From there I would go back on the right side to the area of the fel control valve. There I can take advantage of the existing hose loop that allows for the rotational movement of the arms. At that area I will have another set of couplers jic I ever want to remove the loader.
From those couplers it goes to the back going under the right side foot well, over the hydraulic filter, over the rear axle and up to the remote connections.
Below is the path I'm proposing. I would appreciate any comments on anything I missed or a better way.
Oh, and I marked my arrows backwards I was thinking about it from back to front
Then from under footwell follow hoses to loader valve
then follow the bundled hose loop to get under the fel arm - its somewhere around here I need the coupler set, perhaps a bracket mounted to the 5" loader support tube?
Pop out from under the arm and go to breakaway couplers
Plate with breakaway couplers here for the grapple connection
Well that's the plan, any suggestions?